logo

Gunning Solar Farm Hybrid Project

Sector: Solar • Location: Lade Vale, New South Wales, Australia

Source: Saur Energy

Project
Awarded

A 290 MW solar project with a 542 MWh BESS operated by Zero-E/Grupo Cobra in Lade Vale, New South Wales.

Status
Closed
Sector
Solar, Raw Materials
Location
Lade Vale, New South Wales, Australia
Updated
22 Jul 2026
Source
Saur Energy

ConstructChat

Ask ConstructChat about Gunning Solar Farm Hybrid Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Gunning Solar Farm Hybrid Project” is an infrastructure initiative in the Solar sector, located in Lade Vale, New South Wales, Australia. Taiyo aggregates data on it from Saur Energy.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 290 MW solar project with a 542 MWh BESS operated by Zero-E/Grupo Cobra in Lade Vale, New South Wales.

Original sector

Energy

Location

Country

Australia

State

New South Wales

City

Lade Vale

Source

Source

Saur Energy

URL

More Details

Record type

Project

Sector

Solar, Raw Materials

Article published date

2026-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project