Gunston Fire Station #20 Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
A. Phase 1: Construction of a new 17,600 square-foot, 2-story, 4-bay facility, and associated site work. The first floor will feature the apparatus bays, administrative offices, common living areas, and support spaces for operations of the facility. The second floor will contain the living quarters for station personnel, support spaces, bunk rooms, lockers, showers, laundry, and restrooms. Geother
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Solar, Residential, Commercial, Power Generation (CCGT), Geothermal, Government
- Location
- Lorton, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Gunston Fire Station 20 Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. Phase 1: Construction of a new 17,600 square-foot, 2-story, 4-bay facility, and associated site work. The first floor will feature the apparatus bays, administrative offices, common living areas, and support spaces for operations of the facility. The second floor will contain the living quarters for station personnel, support spaces, bunk rooms, lockers, showers, laundry, and restrooms. Geothermal will be utilized for heating and cooling and a photovoltaic solar array will be installed on ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Lorton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Solar, Residential, Commercial, Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
