Gunter Landing Lift Station 3 Improvements
Sector: Water Supply and Storage • Location: Guntersville, Alabama, United States of America
Source: Dodge USA
Sanitary sewer lift station improvements at Guntersville Water and Sewer Boards Gunter Landing Lift Station 3 including grading and site improvements; chain link fence improvements; wet well pump and piping replacement, top section and access door replacement, and concrete repair; valve vault piping and valve replacement, and top and access door replacement; addition of emergency pipe connection;
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- Guntersville, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gunter Landing Lift Station 3 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sanitary sewer lift station improvements at Guntersville Water and Sewer Boards Gunter Landing Lift Station 3 including grading and site improvements; chain link fence improvements; wet well pump and piping replacement, top section and access door replacement, and concrete repair; valve vault piping and valve replacement, and top and access door replacement; addition of emergency pipe connection; float control, and control panel replacement; electrical system improvements including service li... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Guntersville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
