GURI HYDROELECTRIC P

Sector: Water Supply and Storage • Location: Venezuela, Republica Bolivariana de

Source: World Bank Group

Project
Closed

The Guri Hydroelectric Project will finance the foreign exchange costs of the first stage of the Guri hydroelectric development on the Caroni River. The project has been planned by Corporacion Venezolana de Guayana (CVG), a government development authority. It will consist of a dam, a power plant with a capacity of 350 MW, and 80 km of 230-kv transmission line to a substation at Matanzas which ser

Project Information FAQ

Project Information

5 Q
The project “GURI HYDROELECTRIC P” is an infrastructure initiative in the Water Supply and Storage sector, located in Venezuela, Republica Bolivariana de. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Guri Hydroelectric Project will finance the foreign exchange costs of the first stage of the Guri hydroelectric development on the Caroni River. The project has been planned by Corporacion Venezolana de Guayana (CVG), a government development authority. It will consist of a dam, a power plant with a capacity of 350 MW, and 80 km of 230-kv transmission line to a substation at Matanzas which serves the Macagua hydroelectric plant. The project will comprise the following major elements: a) The main dam consisting of a concrete gravity type center section, in which initially two sets of intake gates and penstocks will be installed, with provision for the later installation of 8 additional intakes and penstocks; a concrete chute type spillway controlled by nine radical gates; and a rockfill embankment on the left abutment, connected to the center gravity section. b) A power station, immediately below the dam, in which will be installed two hydroelectric units of 175 MW each operating under a maximum gross head of 92 meters. c) An emergency fuse plug spillway and two flood control training dikes in a small valley a short distance from the main river valley. d) A switching station situated on the left bank of the river about 1,400 meters downstream of the main dam. e) A 230-kv double-circuit steel tower transmission line, about 80 km long, to connect the power plant with the Guayana substation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data