GURI HYDROELECTRIC P
Sector: Water Supply and Storage • Location: Venezuela, Republica Bolivariana de
Source: World Bank Group
The Guri Hydroelectric Project will finance the foreign exchange costs of the first stage of the Guri hydroelectric development on the Caroni River. The project has been planned by Corporacion Venezolana de Guayana (CVG), a government development authority. It will consist of a dam, a power plant with a capacity of 350 MW, and 80 km of 230-kv transmission line to a substation at Matanzas which ser
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Guri Hydroelectric Project will finance the foreign exchange costs of the first stage of the Guri hydroelectric development on the Caroni River. The project has been planned by Corporacion Venezolana de Guayana (CVG), a government development authority. It will consist of a dam, a power plant with a capacity of 350 MW, and 80 km of 230-kv transmission line to a substation at Matanzas which serves the Macagua hydroelectric plant. The project will comprise the following major elements: a) The main dam consisting of a concrete gravity type center section, in which initially two sets of intake gates and penstocks will be installed, with provision for the later installation of 8 additional intakes and penstocks; a concrete chute type spillway controlled by nine radical gates; and a rockfill embankment on the left abutment, connected to the center gravity section. b) A power station, immediately below the dam, in which will be installed two hydroelectric units of 175 MW each operating under a maximum gross head of 92 meters. c) An emergency fuse plug spillway and two flood control training dikes in a small valley a short distance from the main river valley. d) A switching station situated on the left bank of the river about 1,400 meters downstream of the main dam. e) A 230-kv double-circuit steel tower transmission line, about 80 km long, to connect the power plant with the Guayana substation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
