logo
ProjectClosed

GURI HYDROELECTRIC P

Sector: Water Supply and Storage • Location: Venezuela, Republica Bolivariana de

Source: World Bank Group

The Guri Hydroelectric Project will finance the foreign exchange costs of the first stage of the Guri hydroelectric development on the Caroni River. The project has been planned by Corporacion Venezolana de Guayana (CVG), a government development authority. It will consist of a dam, a power plant with a capacity of 350 MW, and 80 km of 230-kv transmission line to a substation at Matanzas which ser

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Metal, Steel, Government
Location
Venezuela
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GURI HYDROELECTRIC P

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GURI HYDROELECTRIC P” is an infrastructure initiative in the Water Supply and Storage sector, located in Venezuela, Republica Bolivariana de. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Guri Hydroelectric Project will finance the foreign exchange costs of the first stage of the Guri hydroelectric development on the Caroni River. The project has been planned by Corporacion Venezolana de Guayana (CVG), a government development authority. It will consist of a dam, a power plant with a capacity of 350 MW, and 80 km of 230-kv transmission line to a substation at Matanzas which serves the Macagua hydroelectric plant. The project will comprise the following major elements: a) The main dam consisting of a concrete gravity type center section, in which initially two sets of intake gates and penstocks will be installed, with provision for the later installation of 8 additional intakes and penstocks; a concrete chute type spillway controlled by nine radical gates; and a rockfill embankment on the left abutment, connected to the center gravity section. b) A power station, immediately below the dam, in which will be installed two hydroelectric units of 175 MW each operating under a maximum gross head of 92 meters. c) An emergency fuse plug spillway and two flood control training dikes in a small valley a short distance from the main river valley. d) A switching station situated on the left bank of the river about 1,400 meters downstream of the main dam. e) A 230-kv double-circuit steel tower transmission line, about 80 km long, to connect the power plant with the Guayana substation.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Venezuela

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Metal, Steel, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project