Guris Dinar Wind Farm
Sector: Wind • Location: Turkey
Source: World Bank Group
Olgu Enerji Uretim A.S, subsidiary of Güris Holding A.S. and Mogan Enerji Yatirim Holding (MEYH) A.S., was planning the development of the 50.6MW Dinar wind farm, Afyon City, South Western Turkey. The project was to consist of 22 turbines of 2.3MW each.
The equipment supply contract was awarded to Siemens in March 2012, for their SWT-2.3-108 turbines, including a 5 year service contract. Commissi
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Guris Dinar Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Olgu Enerji Uretim A.S, subsidiary of Güris Holding A.S. and Mogan Enerji Yatirim Holding (MEYH) A.S., was planning the development of the 50.6MW Dinar wind farm, Afyon City, South Western Turkey. The project was to consist of 22 turbines of 2.3MW each. The equipment supply contract was awarded to Siemens in March 2012, for their SWT-2.3-108 turbines, including a 5 year service contract. Commissioning was expected for early 2013. Construction started in fall 2012. No further information was available. |
Original sector | Energy |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Commercial, Government |
Article published date | 2024-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
