logo
ProjectClosed

Gurnee Width Pavement Resurfacing

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

CONST. VAR. WIDTH PAV'T RESURFACING W/ 14492.5 TON HOT-MIX SURF. CRSE.; 5072.5 TON LEVEL BINDER, N50 (MACHINE METHOD); 9796 TON HMA BINDER; 31486 SY PAV'T PATCHING CL-D (VARIOUS THICKNESS); 10955 FT COMB. CONC. C&G REM. & REPL.; 8141 SF PCC SIDEWALK REM. & REPL.; 127361 SY HOT-MIX ASPHALT REM. (VARIOUS THICKNESS); 48893 SY PREPARATION OF BASE, 247 EA DRAINAGE AND MH STRUCTURE ADJUSTMENTS; 49962 FT

Status
Closed
Sector
Government, Car parking, Commercial, Road, Automotive, Waste Processing and Treatment
Location
Gurnee, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Gurnee Width Pavement Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gurnee Width Pavement Resurfacing” is an infrastructure initiative in the Government sector, located in Gurnee, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

CONST. VAR. WIDTH PAV'T RESURFACING W/ 14492.5 TON HOT-MIX SURF. CRSE.; 5072.5 TON LEVEL BINDER, N50 (MACHINE METHOD); 9796 TON HMA BINDER; 31486 SY PAV'T PATCHING CL-D (VARIOUS THICKNESS); 10955 FT COMB. CONC. C&G REM. & REPL.; 8141 SF PCC SIDEWALK REM. & REPL.; 127361 SY HOT-MIX ASPHALT REM. (VARIOUS THICKNESS); 48893 SY PREPARATION OF BASE, 247 EA DRAINAGE AND MH STRUCTURE ADJUSTMENTS; 49962 FT. THERMO. PVMT MARKING LINE (4"-24"); AND OTHER RELATED ITEMS IN ACCORDANCE WITH THE PLANS AND SP...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Gurnee

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Car parking, Commercial, Road, Automotive, Waste Processing and Treatment

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project