logo
ProjectPlanning Schematics

Gurney-Mola Solar Array

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: Dodge USA

2.5 MW photovoltaic system with 1.25 MW dc battery storage unit

Status
Prospective
Sector
Energy Storage, Power Transmission, Solar, Power Generation (CCGT), Commercial
Location
Freetown, Massachusetts, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Gurney-Mola Solar Array

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gurney-Mola Solar Array” is an infrastructure initiative in the Energy Storage sector, located in Freetown, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

2.5 MW photovoltaic system with 1.25 MW dc battery storage unit

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Freetown

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Energy Storage, Power Transmission, Solar, Power Generation (CCGT), Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project