logo

Guyana Flood Risk Management

Sector: Water Supply and Storage • Location: Guyana

Source: World Bank Group

Project
Closed

The objective of the Flood Risk Management Project for Guyana is to reduce the risk of flooding in the low-lying areas of the East Demarara. The project has three components. (1) Priority works for flood risk reduction component includes: upgrading critical sections of the East Demerara Water Conservancy, or EDWC dams selected pursuant to the criteria set forth in the construction supervision and

Project Information FAQ

Project Information

5 Q
The project “Guyana Flood Risk Management” is an infrastructure initiative in the Water Supply and Storage sector, located in Guyana. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Flood Risk Management Project for Guyana is to reduce the risk of flooding in the low-lying areas of the East Demarara. The project has three components. (1) Priority works for flood risk reduction component includes: upgrading critical sections of the East Demerara Water Conservancy, or EDWC dams selected pursuant to the criteria set forth in the construction supervision and quality assurance plan; carrying out priority flood risk reduction investments in the East Coast Demerara drainage system selected pursuant to the criteria set forth in the construction supervision and quality assurance plan. (2) Institutional strengthening for flood risk reduction component will support flood modeling through the following activities: (i) hydraulic and hydrological modeling; (ii) specialized training in hydraulic and hydrological modelling, use of remote sensing tools, and data management; and (iii) information technology support for management of data. (3) Project management and implementation component will support reporting and autiting activities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data