Guye District transportation improvement project
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
This project is the construction and operation management of the road improvement and upgrading project in Guye District, Tangshan City, including the following two aspects: 1) The ring road improvement project in Guye District. The length of the route is 40.531 kilometers. The reconstruction content includes: major repair (structural repair) of the outer ring road of Guye District, totaling about
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Road, Car parking, Bridge, Rail, Government, Automotive
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Guye District transportation improvement project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the construction and operation management of the road improvement and upgrading project in Guye District, Tangshan City, including the following two aspects: 1) The ring road improvement project in Guye District. The length of the route is 40.531 kilometers. The reconstruction content includes: major repair (structural repair) of the outer ring road of Guye District, totaling about 23 kilometers; excavation and repair (combination of structural and functional repair) to the remaining sections. 2) 205 urban section road upgrading and reconstruction project. The total length is 2.589 kilometers, and the red line width of the road is 27 meters. Among them, the motor vehicle lane is 16 meters wide, and the side strips on both sides are 5.5 meters wide (1.5 meters of green facilities belt, 2 meters of non-motor vehicle lanes, and 2 meters of sidewalks). The renovation content includes: road engineering, lighting engineering, greening engineering, traffic engineering, etc. At the same time, the existing bridge deck renovation, railway crossing renovation, rainwater grate and inspection well cover renovation, water collection branch pipe replacement, etc. Total investment stands at $ 32.79 million. Cooperation period is 20 years with a ROT type. Financial close took place on September 16, 2020. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/45dd8a28c14f4b82accca437f79b84bd |
Original sector | Transport |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road, Car parking, Bridge, Rail, Government, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant
