Guzar Solar Guaranteed Facility
One of 10,000+ projects Taiyo tracks in Uzbekistan.
Source: European Bank for Reconstruction and Development (EBRD)
The provision of a guaranteed facility of up to US$ 25.0 million to finance expected VAT payments during the construction of the Guzar Solar Photovoltaic Power Plant with an installed capacity of 300 MW and a battery energy storage system with 75 MW installed capacity in the Guzar district of Kashkadarya region of Uzbekistan (the project). The financing will be provided to Nur Kashkadarya Solar PV
- Status
- Prospective
- Sector
- Solar, Water Supply and Storage, Government, Geothermal, Wind, Warehouse, Energy Storage, Bridge, Residential, Power Transmission, Power Generation (CCGT), Commercial, Road
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Guzar Solar Guaranteed Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | exploratory |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The provision of a guaranteed facility of up to US$ 25.0 million to finance expected VAT payments during the construction of the Guzar Solar Photovoltaic Power Plant with an installed capacity of 300 MW and a battery energy storage system with 75 MW installed capacity in the Guzar district of Kashkadarya region of Uzbekistan (the project). The financing will be provided to Nur Kashkadarya Solar PV FE LLC, a special purpose vehicle (the borrower) established in Uzbekistan and fully owned by Abu Dhabi Future Energy Company PJSC (the sponsor, Masdar). |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Government, Geothermal, Wind, Warehouse, Energy Storage, Bridge, Residential, Power Transmission, Power Generation (CCGT), Commercial, Road |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project