logo

GVK Bagodara Vasad Expressway Private Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Active

On 3rd January 2011, the Gujarat State Road Development Corporation (GSRDC) awarded a 27 year concession (including construction period of 30 months) with GVK Power & Infrastructure Limited (through its subsidiary GVK Developmental Projects Private Limited) for the rehabilitation, upgradation and operations and tolling of Bagodara-Wataman-Tarapur-Vasad section of State Highway-8, from Km 0/0 to Km

Project Information FAQ

Project Information

4 Q
The project “GVK Bagodara Vasad Expressway Private Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On 3rd January 2011, the Gujarat State Road Development Corporation (GSRDC) awarded a 27 year concession (including construction period of 30 months) with GVK Power & Infrastructure Limited (through its subsidiary GVK Developmental Projects Private Limited) for the rehabilitation, upgradation and operations and tolling of Bagodara-Wataman-Tarapur-Vasad section of State Highway-8, from Km 0/0 to Km 101/9, in the State of Gujarat. Under the contract, GVK Power & Infrastructure Limited was responsible for the the design, construction, finance, operation and maintenance,strengthening of the existing 2-lane carriageway to a 6-lane highway with paved shoulders. The scope will include construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts,road intersections,interchanges, drains, traffic signages, traffic safety measures, etc. The project highway provides key connectivity to two national highways -NH8A (Ahmedabad-Rajkot-Probandar),and NH-8 (Mumbai-Delhi). The said highway catered to commercial traffic from industrial clusters in Bhavnagar, Savli, Sanand, Anand and ports in Saurashtra region (Pipavav, Porbandar, Mundra and Kandla). Also, it was the shortest link connecting Saurashtra/Kutch region to the highly industrialised regions of Surat,Vadodara,Ankleshwar and Mumbai.This road upgradation was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. GVK Power & Infrastructure Limited established GVK Bagodara Vasad Expressway Private Limited (GVKBVEPL), a special purpose vehicle, to implement the project. The SPV won the tender through domestic competitive bidding, conducted by GSRDC, by quoting the highest revenue share (premium). The SPV had quoted a revenue share of 15% for the 1st year which would increase every year by 1% through the life of the concession. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. GVK Projects and Technical Services is the EPC contractor of the project. The concession agreement was signed in 21st February 2011. The project attained financial closure on 16th November 2011. The debt equity ratio of the project was 75:25. The estimated capital cost of the project at the time of financial closure was US$ 237.8mn(INR 11890.3mn @ 50 INR/USD).Financing comprised a 17-year 3-month term loan of US$ 178.3mn (INR 8917.70mn) and sponsor equity of US$ 59.4mn (INR 2972.60mn). The debt was arranged by Axis Bank Limited. Construction on the project was expected to begin in March 2011 and was expected to be completed by September 2013.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data