GVK Shivpuri Dewas Expressway Private Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Cancelled

In October 2011, the National Highway Authority of India (NHAI) awarded a 30 year concession (including construction period of 30 months) to GVK Power & Infrastructure Limited for the strengthening,improvement, four-laning, operation and maintenance, and tolling of 332.46kms of Shivpuri to Dewas section of National Highway-3 (NH-3),from Km 236.00 to Km 566.45, in the state of Madhya Pradesh.

Unde

Project Information FAQ

Project Information

4 Q
The project “GVK Shivpuri Dewas Expressway Private Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2011, the National Highway Authority of India (NHAI) awarded a 30 year concession (including construction period of 30 months) to GVK Power & Infrastructure Limited for the strengthening,improvement, four-laning, operation and maintenance, and tolling of 332.46kms of Shivpuri to Dewas section of National Highway-3 (NH-3),from Km 236.00 to Km 566.45, in the state of Madhya Pradesh. Under the contract, GVK was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing carriageway to a four-lane highway with paved shoulders. The scope included construction of 4-lanes including construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, service roads, road intersections,interchanges, drains, etc.The expansion project, part of National Highway Development Project Phase-IV will ease traffic congestion and will reduce the time and cost of travel between Shivpuri and Dewas. It would also increase the employment potential for the local laborers and also development of tourism activities.The Project road lies on National Highway No. 3, one of India’s major national highways (commonly referred to as Mumbai-Agra highway) and a vital trade corridor connecting Western and Central India to Northern India. The Project road passes entirely through Madhya Pradesh, carrying predominantly long distance freight traffic and is expected to offer high growth potential for commercial traffic. GVK Power and Infrastructure Limited established GVK Shivpuri Dewas Expressway Private Limited, a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by NHAI,by quoting the highest premium payment to NHAI. The SPV would pay NHAI a sum of of US$ 36.2mn (INR 1809mn @50 INR/USD) in the first year of operations with 5% increase in each subsequent year (This amounted to an NPV payout of US$ 569.6mn over the concession period of 30 years at a discount rate of 10%). There were 19 pre-qualified bidders out of which 14 offered their final bids. The L2 bidder had quoted a premium payment of about INR 1100mn. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement was signed on 12th January 2012. The project had not obtained funding at the time of collection of this information. The estimated capital cost of the project at the time of bidding was US$ 587mn (INR 29351mn @ 50 INR/USD) million. On 13th January 2013, GVK has cancelled this concession siting delays in securing mandatory clearances, including right of way on the part of NHAI (mandated as per the concession agreement). NHAI has not yet accepted the unilateral cancellation of the concession and holds that aggressive bidding ( US$36.2mn per annum was one of the highest premium ever quoted for any NHAI road project so far!) in the road sector and developers’ growing debt, coupled with banks tightening lending for road projects has led to GVK realizing that the project had become unviable. No decision has yet been formed on the cancellation of this project. In May 2014, NHAI finally cancelled the concession for the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data