Gvozd Wind Farm
Sector: Power Generation (CCGT) • Location: Montenegro
Source: vijesti.me
The Gvozd wind farm project involves the installation of eight wind generators with a total installed capacity of 54.6 MW. The first wind generator, with a power of 7 MW, has been put into trial operation and is producing electricity delivered to the Montenegrin power system. The project aims to strengthen the stability of the electricity system and promote renewable energy production in Montenegr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Gvozd wind farm project involves the installation of eight wind generators with a total installed capacity of 54.6 MW. The first wind generator, with a power of 7 MW, has been put into trial operation and is producing electricity delivered to the Montenegrin power system. The project aims to strengthen the stability of the electricity system and promote renewable energy production in Montenegro. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
