Gvozd Wind Farm
Sector: Wind • Location: Gvozd, Montenegro
Source: KoSSev
The Gvozd wind farm in Montenegro, with an installed capacity of 54 MW, is under construction and being developed by the Electric Power Company of Montenegro (EPCG). The project is financed by a loan from the European Bank for Reconstruction and Development amounting to 82 million euros.
- Status
- Under Construction
- Sector
- Wind, Power Generation (CCGT), Raw Materials
- Location
- Gvozd, Montenegro
- Updated
- 22 Jul 2026
- Source
- KoSSev
ConstructChat
Ask ConstructChat about Gvozd Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Gvozd wind farm in Montenegro, with an installed capacity of 54 MW, is under construction and being developed by the Electric Power Company of Montenegro (EPCG). The project is financed by a loan from the European Bank for Reconstruction and Development amounting to 82 million euros. |
Original sector | Energy |
Budget |
Location
Country | Montenegro |
City | Gvozd |
Source
Source | KoSSev |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
