logo

GW Ranch Off-Grid Power Campus

Sector: Power Generation (CCGT) • Location: Texas, United States

Source: Cato Institute

Project
Under Construction

An off-grid campus in Pecos County, Texas, designed to provide more than 5 GW of power to hyperscale data centers. The project aims to bypass traditional interconnection queues to rapidly begin operation, with first power targeted for Q1 2027 and a larger phased buildout thereafter.

Status
Under Construction
Sector
Power Generation (CCGT), Commercial
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Cato Institute

ConstructChat

Ask ConstructChat about GW Ranch Off-Grid Power Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “GW Ranch Off-Grid Power Campus” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Texas, United States. Taiyo aggregates data on it from Cato Institute.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An off-grid campus in Pecos County, Texas, designed to provide more than 5 GW of power to hyperscale data centers. The project aims to bypass traditional interconnection queues to rapidly begin operation, with first power targeted for Q1 2027 and a larger phased buildout thereafter.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

Source

Source

Cato Institute

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial

Article published date

2026-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project