logo

GW Ranch Off-Grid Power Generation Project

Sector: Energy Storage • Location: Pecos County, Texas, United States

Source: Home | EnergyTech

Project
Planned

Pacifico Energy plans to build GW Ranch, an off-grid power generation project in Pecos County, Texas. The project will combine natural gas-fired turbine generation with large battery storage capacity to provide power directly to hyperscale data centers and AI loads. The project aims to build 5 GW of off-grid and gas-fired energy capacity, starting with 1 GW by 2028, avoiding connection to the ERCO

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT), Data Center, Natural Gas, Residential, Wind
Location
Pecos County, Texas, United States of America
Updated
22 Jul 2026
Source
Home | EnergyTech

ConstructChat

Ask ConstructChat about GW Ranch Off-Grid Power Generation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GW Ranch Off-Grid Power Generation Project” is an infrastructure initiative in the Energy Storage sector, located in Pecos County, Texas, United States. Taiyo aggregates data on it from Home | EnergyTech.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pacifico Energy plans to build GW Ranch, an off-grid power generation project in Pecos County, Texas. The project will combine natural gas-fired turbine generation with large battery storage capacity to provide power directly to hyperscale data centers and AI loads. The project aims to build 5 GW of off-grid and gas-fired energy capacity, starting with 1 GW by 2028, avoiding connection to the ERCOT grid to reduce permitting delays.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

City

Pecos County

Source

Source

Home | EnergyTech

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Data Center, Natural Gas, Residential, Wind

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project