Gwalior Bypass on NH-3 and NH-75

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In March 2007, the National Highways Authority of India (NHAI) signed a 20 year contract (including construction period of two and a half years) to the consortium of Era Constructions Ltd.(39%), Ramky Infrastructures Ltd.(51%), and Shriram Chits Pvt. Ltd. (10%) to construct a new four lane Gwalior bypass.

The bypass will connect the total stretch of 42 Km on NH-3 and NH-75 in the state of Madhy

Project Information FAQ

Project Information

4 Q
The project “Gwalior Bypass on NH-3 and NH-75” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In March 2007, the National Highways Authority of India (NHAI) signed a 20 year contract (including construction period of two and a half years) to the consortium of Era Constructions Ltd.(39%), Ramky Infrastructures Ltd.(51%), and Shriram Chits Pvt. Ltd. (10%) to construct a new four lane Gwalior bypass. The bypass will connect the total stretch of 42 Km on NH-3 and NH-75 in the state of Madhya Pradesh. Gwalior Bypass Project Pvt. Ltd. (GBPPL), was the company established to implement the project. The consortium won the tender through competitive bidding conducted by NHAI with lowest annuity payment as the bidding criteria. Under the contract, GBPPL was responsible for the design, construction, finance, operation and maintenance of the bypass road. The expansion project, part of National Highway Development Project - Phase II, was expected to ease traffic congestion of the existing north-south corridor and the city of Gwalior and give significant stimulus to trade and commerce in the entire region. Under the contract, GBPPL was allowed to recover the capital and operating costs through fixed annual payment (annuity) of US$ 13.26 million during the concession term. Under the annuity scheme the private operator was not allowed to collect tolls from the users. The project reached financial closure in March 2007 with a debt equity ratio of 4:1. The total capital cost of the project was estimated at US$ 75.23 million. Construction on the project began in March 2007 and was expected to be completed by October 2009. www.projectstoday.com www.pppinindia.com www.nhai.org www.infrastructure.gov.in http://www.projectsmonitor.com/detailnews.asp?newsid=13833

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data