Gwalior Bypass on NH-3 and NH-75
Active · Benue
Source: World Bank Group
In March 2007, the National Highways Authority of India (NHAI) signed a 20 year contract (including construction period of two and a half years) to the consortium of Era Constructions Ltd.(39%), Ramky Infrastructures Ltd.(51%), and Shriram Chits Pvt. Ltd. (10%) to construct a new four lane Gwalior bypass.
The bypass will connect the total stretch of 42 Km on NH-3 and NH-75 in the state of Madhy
- Status
- Prospective
- Sector
- Road, Government, Commercial
- Location
- Benue, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Gwalior Bypass on NH-3 and NH-75
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In March 2007, the National Highways Authority of India (NHAI) signed a 20 year contract (including construction period of two and a half years) to the consortium of Era Constructions Ltd.(39%), Ramky Infrastructures Ltd.(51%), and Shriram Chits Pvt. Ltd. (10%) to construct a new four lane Gwalior bypass. The bypass will connect the total stretch of 42 Km on NH-3 and NH-75 in the state of Madhya Pradesh. Gwalior Bypass Project Pvt. Ltd. (GBPPL), was the company established to implement the project. The consortium won the tender through competitive bidding conducted by NHAI with lowest annuity payment as the bidding criteria. Under the contract, GBPPL was responsible for the design, construction, finance, operation and maintenance of the bypass road. The expansion project, part of National Highway Development Project - Phase II, was expected to ease traffic congestion of the existing north-south corridor and the city of Gwalior and give significant stimulus to trade and commerce in the entire region. Under the contract, GBPPL was allowed to recover the capital and operating costs through fixed annual payment (annuity) of US$ 13.26 million during the concession term. Under the annuity scheme the private operator was not allowed to collect tolls from the users. The project reached financial closure in March 2007 with a debt equity ratio of 4:1. The total capital cost of the project was estimated at US$ 75.23 million. Construction on the project began in March 2007 and was expected to be completed by October 2009. www.projectstoday.com www.pppinindia.com www.nhai.org www.infrastructure.gov.in http://www.projectsmonitor.com/detailnews.asp?newsid=13833 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
State | Benue |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited