logo

GZ-ELECTRIC UTILITY MANAGEMENT PROJECT

Sector: Solar • Location: West Bank and Gaza

Source: World Bank Group

Project
Closed

The objective of the Electric Utility Management Project for West Bank and Gaza is to reduce the fiscal burden of the electricity sector on Palestinian Authority (PA's) budgetary resources through lower deductions from clearance revenues for arrears owed to Israel Electric Corporation Limited (IEC). There are three components to the project. The first component is the supply and installs four new

Project Information FAQ

Project Information

5 Q
The project “GZ-ELECTRIC UTILITY MANAGEMENT PROJECT” is an infrastructure initiative in the Solar sector, located in West Bank and Gaza. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Electric Utility Management Project for West Bank and Gaza is to reduce the fiscal burden of the electricity sector on Palestinian Authority (PA's) budgetary resources through lower deductions from clearance revenues for arrears owed to Israel Electric Corporation Limited (IEC). There are three components to the project. The first component is the supply and installs four new bulk 161/33/22kV supply substations5 in the northern, central and southern areas of the West Bank. These substations will replace most of IEC's existing connection points (33kV and 22kV and 400V) that supply Palestinian load centers. The West Bank will then be supplied at IEC's high voltage tariff, which is lower than IEC's current flat tariff. It will also allow substantial growth in electricity purchases from IEC that could not otherwise happen, and which therefore provides a good incentive for IEC to support the modification. The second component includes: (i) development of the new power distribution system in the northern, central and southern areas of the West Bank served by the new 161 kV substation; (ii) rehabilitation of distribution networks in all the electricity utilities of the West Bank and Gaza; and (iii) installation of prepaid meters and automatic meters reading systems in all utilities of the West Bank and Gaza. Finally, the third component includes: (a) capacity building for all electricity utilities in the West Bank and Gaza; this includes technical assistance for procurement of tools, vehicles, IT hardware or software and training; (b) providing consulting services to Palestinian Energy and Natural Resources Authority (PEA) for promoting the development and utilization of renewable energy resources and adopting energy efficiency measures. This component will assess the renewable energy resources of West Bank and Gaza, particularly solar, and facilitate the development of an appropriate institutional and legal framework. Consulting services will also include development of the second stage of electricity sector reform and auditing services for the Project Management Unit (PMU); and (c) operating cost of the PMU.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data