The objective of the Electric Utility Management Project for West Bank and Gaza is to reduce the fiscal burden of the electricity sector on Palestinian Authority (PA's) budgetary resources through lower deductions from clearance revenues for arrears owed to Israel Electric Corporation Limited (IEC). There are three components to the project. The first component is the supply and installs four new
- Status
- Closed
- Sector
- Solar, Power Transmission, Automotive, Power Generation (CCGT), Government, Residential, Commercial
- Location
- West Bank and Gaza
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about GZ-ELECTRIC UTILITY MANAGEMENT PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Electric Utility Management Project for West Bank and Gaza is to reduce the fiscal burden of the electricity sector on Palestinian Authority (PA's) budgetary resources through lower deductions from clearance revenues for arrears owed to Israel Electric Corporation Limited (IEC). There are three components to the project. The first component is the supply and installs four new bulk 161/33/22kV supply substations5 in the northern, central and southern areas of the West Bank. These substations will replace most of IEC's existing connection points (33kV and 22kV and 400V) that supply Palestinian load centers. The West Bank will then be supplied at IEC's high voltage tariff, which is lower than IEC's current flat tariff. It will also allow substantial growth in electricity purchases from IEC that could not otherwise happen, and which therefore provides a good incentive for IEC to support the modification. The second component includes: (i) development of the new power distribution system in the northern, central and southern areas of the West Bank served by the new 161 kV substation; (ii) rehabilitation of distribution networks in all the electricity utilities of the West Bank and Gaza; and (iii) installation of prepaid meters and automatic meters reading systems in all utilities of the West Bank and Gaza. Finally, the third component includes: (a) capacity building for all electricity utilities in the West Bank and Gaza; this includes technical assistance for procurement of tools, vehicles, IT hardware or software and training; (b) providing consulting services to Palestinian Energy and Natural Resources Authority (PEA) for promoting the development and utilization of renewable energy resources and adopting energy efficiency measures. This component will assess the renewable energy resources of West Bank and Gaza, particularly solar, and facilitate the development of an appropriate institutional and legal framework. Consulting services will also include development of the second stage of electricity sector reform and auditing services for the Project Management Unit (PMU); and (c) operating cost of the PMU. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | West Bank and Gaza |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Automotive, Power Generation (CCGT), Government, Residential, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in West Bank and Gaza
- Nakheel Palestine for Agricultural Investment
- PRICO Operations Rooftop Solar
- APIC Bond - DCM
- Massader School Rooftop PV Program
- Finance for Jobs II
- Finance for Jobs II Additional Financing
- PRICO Solar Gaza
- Phase 1 Advancing Sustainability in Performance, Infrastructure, and Reliability of the Energy Sector in the West Bank and Gaza