logo
ProjectClosed

H-21 Dam Outlet Control Structure Maintenance.

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Dodge USA

ject Description: Project provides for rehabilitation of the existing primary spillway at the Haynes Creek Site No. 21 (H-21) Dam. Rehabilitation of the primary spillway includes replacement of the outlet control structure s low-level gate and repair of the outlet plunge pool. The project also includes clearing of vegetation in areas including the toe of the dam and the dam s auxiliary spillway an

Status
Closed
Sector
Car parking, Consumer Products, Hydro, Automotive, Government, Commercial, Water Supply and Storage
Location
Loganville, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about H-21 Dam Outlet Control Structure Maintenance.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “H-21 Dam Outlet Control Structure Maintenance.” is an infrastructure initiative in the Car parking sector, located in Loganville, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ject Description: Project provides for rehabilitation of the existing primary spillway at the Haynes Creek Site No. 21 (H-21) Dam. Rehabilitation of the primary spillway includes replacement of the outlet control structure s low-level gate and repair of the outlet plunge pool. The project also includes clearing of vegetation in areas including the toe of the dam and the dam s auxiliary spillway and resurfacing of the parking area at the site access point.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Loganville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Consumer Products, Hydro, Automotive, Government, Commercial, Water Supply and Storage

Article published date

2024-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project