H-4 Flood Mitigation Retention Pond
The owner, status and timeline of this project. A free account opens every field.
Source: Patch
The H-4 flood mitigation pond is the third and largest retention pond completed as part of the Ellicott City Safe and Sound Plan. It provides more than 5.5 million gallons of stormwater storage, equivalent to a football field filled with nearly 12.8 feet of water. The project includes planting 560 trees and 370 shrubs to restore green space and preserves close to 6 acres of mature woods adjacent t
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ellicott City, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about H-4 Flood Mitigation Retention Pond
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The H-4 flood mitigation pond is the third and largest retention pond completed as part of the Ellicott City Safe and Sound Plan. It provides more than 5.5 million gallons of stormwater storage, equivalent to a football field filled with nearly 12.8 feet of water. The project includes planting 560 trees and 370 shrubs to restore green space and preserves close to 6 acres of mature woods adjacent to the pond. |
Original sector | Flood Mitigation |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Ellicott City |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
