H2 Green Steel Plant
Sector: Manufacturing (Industrial) • Location: Boden, Sweden
Source: GreentechLead
A pioneering green steel plant in Boden, Sweden with 800 MW electrolyser capacity, producing 2.5 million tons of green steel starting in 2025. Over €6.5 billion secured in funding, including €250 million from the EU Innovation Fund.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Hydrogen, Steel, Government, Metal
- Location
- Boden, Sweden
- Updated
- 22 Jul 2026
- Source
- GreentechLead
ConstructChat
Ask ConstructChat about H2 Green Steel Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A pioneering green steel plant in Boden, Sweden with 800 MW electrolyser capacity, producing 2.5 million tons of green steel starting in 2025. Over €6.5 billion secured in funding, including €250 million from the EU Innovation Fund. |
Original sector | Energy |
Budget |
Location
Country | Sweden |
City | Boden |
Source
Source | GreentechLead |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Hydrogen, Steel, Government, Metal |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
