H2Coastlink 1 Hydrogen Pipeline
Sector: Government • Location: Emden, Lower Saxony, Germany
Source: Fuel Cells Works
Friedrich Vorwerk Group SE was awarded a major contract for the construction of the H2Coastlink 1 hydrogen pipeline between Emden and Leer, Germany. The pipeline is approximately 24 km long with a diameter of DN 400 and will connect a 320 MW hydrogen generation plant with the hydrogen infrastructure in Leer-Nord. The project is supported by the German Federal Government's IPCEI hydrogen program an
- Status
- Closed
- Sector
- Government, Hydrogen
- Location
- Emden, Lower Saxony, Germany
- Updated
- 22 Jul 2026
- Source
- Fuel Cells Works
ConstructChat
Ask ConstructChat about H2Coastlink 1 Hydrogen Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Friedrich Vorwerk Group SE was awarded a major contract for the construction of the H2Coastlink 1 hydrogen pipeline between Emden and Leer, Germany. The pipeline is approximately 24 km long with a diameter of DN 400 and will connect a 320 MW hydrogen generation plant with the hydrogen infrastructure in Leer-Nord. The project is supported by the German Federal Government's IPCEI hydrogen program and is part of the German core hydrogen network. |
Original sector | Energy |
Location
Country | Germany |
State | Lower Saxony |
City | Emden |
Source
Source | Fuel Cells Works |
URL |
More Details
Record type | Project |
Sector | Government, Hydrogen |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
