Habshan Gas Complex Restoration
Sector: Oil and Gas • Location: Abu Dhabi, United Arab Emirates
Source: ZAWYA
The Habshan complex, damaged due to conflict in April 2026, is undergoing restoration to resume full operations by 2027. Approximately 60% of processing capacity was restored quickly, with ongoing work to reach 80% restoration by the end of 2026. A technical assessment of the damage is nearing completion. The project also includes Phase 1 of the Rich Gas Development to ease bottlenecks and increas
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Abu Dhabi, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about Habshan Gas Complex Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under restoration |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Habshan complex, damaged due to conflict in April 2026, is undergoing restoration to resume full operations by 2027. Approximately 60% of processing capacity was restored quickly, with ongoing work to reach 80% restoration by the end of 2026. A technical assessment of the damage is nearing completion. The project also includes Phase 1 of the Rich Gas Development to ease bottlenecks and increase gas output. |
Original sector | Oil & Gas |
Location
Country | United Arab Emirates (UAE) |
State | Abu Dhabi |
City | Abu Dhabi |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
