Hackberry Pedestrian Bridge 2025 Annual Painting IQC
Sector: Commercial • Location: Tuscaloosa, Alabama, United States of America
Source: Dodge
The scope of work is to conduct surface preparation, isolated structural repair, field prime and repaint the Hackberry Pedestrian Bridge. The paint sysem is a zinc rich epoxy promer with a polyester urethane intermediate coat and an alaphatic, polyester urethane top coat. The full paint system and surface preperation requirements are provided in the project specifications Existing drawings and pho
- Status
- Closed
- Sector
- Commercial, Bridge, Road
- Location
- Tuscaloosa, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hackberry Pedestrian Bridge 2025 Annual Painting IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work is to conduct surface preparation, isolated structural repair, field prime and repaint the Hackberry Pedestrian Bridge. The paint sysem is a zinc rich epoxy promer with a polyester urethane intermediate coat and an alaphatic, polyester urethane top coat. The full paint system and surface preperation requirements are provided in the project specifications Existing drawings and photographs are provided herein to define the work. It is the contractors responsibility to assess t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Tuscaloosa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
