Hackberry Pedestrian Bridge 2025 Annual Painting IQC
Sector: Road • Location: Tuscaloosa, Alabama, United States of America
Source: Dodge
The scope of work is to conduct surface preparation, isolated structural repair, field prime and repaint the Hackberry Pedestrian Bridge. The paint sysem is a zinc rich epoxy promer with a polyester urethane intermediate coat and an alaphatic, polyester urethane top coat. The full paint system and surface preperation requirements are provided in the project specifications Existing drawings and pho
- Status
- Closed
- Sector
- Road, Commercial, Bridge
- Location
- Tuscaloosa, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hackberry Pedestrian Bridge 2025 Annual Painting IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work is to conduct surface preparation, isolated structural repair, field prime and repaint the Hackberry Pedestrian Bridge. The paint sysem is a zinc rich epoxy promer with a polyester urethane intermediate coat and an alaphatic, polyester urethane top coat. The full paint system and surface preperation requirements are provided in the project specifications Existing drawings and photographs are provided herein to define the work. It is the contractors responsibility to assess t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Tuscaloosa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Bridge |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
