logo

Hackberry Pedestrian Bridge 2025 Annual Painting IQC

Sector: Road • Location: Tuscaloosa, Alabama, United States of America

Source: Dodge

Project
Bid Results

The scope of work is to conduct surface preparation, isolated structural repair, field prime and repaint the Hackberry Pedestrian Bridge. The paint sysem is a zinc rich epoxy promer with a polyester urethane intermediate coat and an alaphatic, polyester urethane top coat. The full paint system and surface preperation requirements are provided in the project specifications Existing drawings and pho

Status
Closed
Sector
Road, Commercial, Bridge
Location
Tuscaloosa, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hackberry Pedestrian Bridge 2025 Annual Painting IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hackberry Pedestrian Bridge 2025 Annual Painting IQC” is an infrastructure initiative in the Road sector, located in Tuscaloosa, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work is to conduct surface preparation, isolated structural repair, field prime and repaint the Hackberry Pedestrian Bridge. The paint sysem is a zinc rich epoxy promer with a polyester urethane intermediate coat and an alaphatic, polyester urethane top coat. The full paint system and surface preperation requirements are provided in the project specifications Existing drawings and photographs are provided herein to define the work. It is the contractors responsibility to assess t...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Tuscaloosa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Commercial, Bridge

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project