logo
ProjectCompleted

Haeckel Hill Wind Farm

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The Project consists of the construction of four wind turbines and associated infrastructure located outside Whitehorse, Yukon. The Project will be constructed between September 2021 to November 2023 and is expected to result in more efficient and reliable energy provision to all thirteen on-grid communities in the territory.

Status
Closed
Sector
Wind, Raw Materials
Location
Yukon, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Haeckel Hill Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Haeckel Hill Wind Farm” is an infrastructure initiative in the Wind sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the construction of four wind turbines and associated infrastructure located outside Whitehorse, Yukon. The Project will be constructed between September 2021 to November 2023 and is expected to result in more efficient and reliable energy provision to all thirteen on-grid communities in the territory.

Original sector

Green Energy

Location

Country

Canada

State

Yukon

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Wind, Raw Materials

Article published date

2026-03-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project