Haeckel Hill Wind Farm
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The Project consists of the construction of four wind turbines and associated infrastructure located outside Whitehorse, Yukon. The Project will be constructed between September 2021 to November 2023 and is expected to result in more efficient and reliable energy provision to all thirteen on-grid communities in the territory.
- Status
- Closed
- Sector
- Wind, Raw Materials
- Location
- Yukon, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Haeckel Hill Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the construction of four wind turbines and associated infrastructure located outside Whitehorse, Yukon. The Project will be constructed between September 2021 to November 2023 and is expected to result in more efficient and reliable energy provision to all thirteen on-grid communities in the territory. |
Original sector | Green Energy |
Location
Country | Canada |
State | Yukon |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
