Hai Basin Integrated Water and Environment Management Project
Sector: Water Supply and Storage • Location: China
Source: World Bank
The overall objective is to catalyze an integrated approach to water resource management and pollution control in the Hai Basin in order to improve the Bohai Sea environment. The project has the following four components: Component 1) Will finance consultant services, training, goods and small works. The Integrated Water and Environment Management (IWEM) will be divided into 3 subcomponents: (a) S
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government, Residential, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Hai Basin Integrated Water and Environment Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall objective is to catalyze an integrated approach to water resource management and pollution control in the Hai Basin in order to improve the Bohai Sea environment. The project has the following four components: Component 1) Will finance consultant services, training, goods and small works. The Integrated Water and Environment Management (IWEM) will be divided into 3 subcomponents: (a) Strategic Studies at the central and Hai Basin levels; (b) integrated water and environment management planning; and (c) demonstration projects. All three of these subcomponents are very closely interrelated. The strategic studies will support and provide guidance to IWEMPs and to the demonstration projects. Component 2) Will finance consultant services, training and goods and will be implemented under the Hai Basin Project Management Office (PMO). The Knowledge Management (KM) component will have 2 subcomponents: (a) KM Development; and (b) Remote Sensing and Evapotranspiration (ET) management systems. These subcomponents are very interrelated and need to be prepared and implemented in a coordinated manner. KM is the technical basis through which the Project will be implemented and all KM activities at all levels are grouped together in this component. Further, to ensure that this remains a needs-driven and not technology-driven component, significant attention will be given to the management of the component. Component 3) Will be implemented under the Tianjin PMO and will assist Tianjin address critical water pollution control issues in the coastal area by supporting two activities under the World Bank-financed Second Tianjin Urban Development and Environment Project (TUDEP2): Component 4) Will finance consultant services, training and goods. Hai Basin Project management will support coordinated and integrated actions by the Ministries/Bureaus of environmental protection and water resources at the various levels. All PMOs will have Joint Expert Groups to assist the PMOs in coordination, review, supervision and in some cases execution of technical activities under the Project. The Central PMOs will be supported by an international expert panel with broad experience in water quality and quantity management, water and environment planning and knowledge management. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,Water, Sanitation and Waste Management |
Budget |
Location
Country | China |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government, Residential, Commercial |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
