logo

Hai Phong City Resilience Development Project

Source: World Bank Group

Project
Pipeline

The proposed project aims to improve the resilience of Hai Phong city through multisectoral investments in transport connectivity, sanitation improvement, urban inundation reduction, and urban resilience capacity. The project will have four components. Component 1 will support development of a new greenfield 18 km-long Ring Road 3 from the intersection with the Bui Vien Road in Hai An area in the

Project Information FAQ

Project Information

5 Q
The project "Hai Phong City Resilience Development Project" is an infrastructure initiative in the Airport, Road, Water Supply and Storage, Biomass, Residential, Government, Manufacturing (Industrial), Metal, Waste Processing and Treatment, Commercial sector, located in N/A, Vietnam. Taiyo aggregates data from World Bank Group, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pipeline

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project aims to improve the resilience of Hai Phong city through multisectoral investments in transport connectivity, sanitation improvement, urban inundation reduction, and urban resilience capacity. The project will have four components. Component 1 will support development of a new greenfield 18 km-long Ring Road 3 from the intersection with the Bui Vien Road in Hai An area in the South to the intersection with National Highway 10 in the Northwest. It will act as an extension of the Hanoi-Hai Phong Expressway to create better connections from the north to the Lach Huyen port, Cat Bi airport and Hai Phong’s industrial parks/economic zones, resulting in lower net GHG emissions due to reduced truck traffic through the city center. Component 2 would help improve environmental sanitation in the catchment area of Re River. It would include support for Re River infrastructure upgrades, Re River basin environmental sanitation improvement including construction of the An Duong 1 Waste Water Treatment Plant (WWTP) with a capacity of 10,000 m3 and construction of tertiary sewer network. Component 3 will help reduce flood risk in the historical city center through an urban resilience strategy of delay, store and discharge and includes construction of two new sluice gates at the joints of existing Tam Bac River with Thuong Ly river and Cam River, thus transforming it into a regulation lake of 10.1 ha for meeting the increasing storm water regulation demand. Component 4 will help enhance capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data