logo

Hainan Dongfang Waste-to-energy Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project involves the construction of Hainan Dongfang Waste-to-energy Plant, located in Dongfang City, Hainan province of China. The project has a designed daily household waste processing capacity of 1,200 tonnes (438,000 tonnes/year) and will be constructed in 2 phases. The 1st phase of plant will be equipped with two 400 tonnes/day grate furnaces and one set of 18 MW turbine power generator.

Status
Prospective
Sector
Government, Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Hainan Dongfang Waste-to-energy Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Hainan Dongfang Waste-to-energy Plant” is an infrastructure initiative in the Government sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of Hainan Dongfang Waste-to-energy Plant, located in Dongfang City, Hainan province of China. The project has a designed daily household waste processing capacity of 1,200 tonnes (438,000 tonnes/year) and will be constructed in 2 phases. The 1st phase of plant will be equipped with two 400 tonnes/day grate furnaces and one set of 18 MW turbine power generator. The sponsor China Everbright international Ltd signed a 30-year concession agreement under BOT (Build-Operate-Transfer) model. The concession period includes the construction as well. The project cost is approximately CNY 520 million or $ 77.39 million and includes the investment of the shared facilities for phase II of the project. Financial close was reached on 31 January 2019. https://www.ebchinaintl.com/en/media/news_content-p190131.html

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project