logo
ProjectPre-Construction

Haines Junction Water Well Replacement

Sector: Water Supply and Storage • Location: Yukon, Canada

Source: Infrastructure Canada

Haines Junction’s two operating water wells are nearing replacement age. Typical water wells are expected to last between 30-40 years, before showing signs of age and begin to need maintenance. Haines Junction’s current wells are both nearing 40 years old. The intention of the new well is to add redundancy to their water supply system, and allow for community growth, as an additional well will inc

Status
Prospective
Sector
Water Supply and Storage, Government
Location
Yukon, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Haines Junction Water Well Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Haines Junction Water Well Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Haines Junction’s two operating water wells are nearing replacement age. Typical water wells are expected to last between 30-40 years, before showing signs of age and begin to need maintenance. Haines Junction’s current wells are both nearing 40 years old. The intention of the new well is to add redundancy to their water supply system, and allow for community growth, as an additional well will increase water supply volumes. The project will drill a new potable water well with suitable water quality and adequate protection for municipal water supply. Additionally, the new well will be connected to the existing water treatment and supply infrastructure. Update existing source water protection planning to account for the new well. Due to Haines Junction’s complicated hydrogeology, a consulting firm was hired to help define the target aquifer and depth to ensure adequate water quality is met with this new well, and limited changes are required to the current water treatment facility.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Yukon

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project