Haining City Water Treatment Plant
Sector: Commercial • Location: China
Source: World Bank Group
In October 2006, Salcon Berhad won a 30-year rehabilitate, build, operate, transfer (RBOT) contract to operate an existing potable water supply plant and construct a new plant in Haining City, Zhejiang Province, China. The existing plant had a capacity of 60,000 cubic meters daily, but was operated beyond capacity at 70,000 cubic meters daily, and the new plant was planned with a capacity of 300,0
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Haining City Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In October 2006, Salcon Berhad won a 30-year rehabilitate, build, operate, transfer (RBOT) contract to operate an existing potable water supply plant and construct a new plant in Haining City, Zhejiang Province, China. The existing plant had a capacity of 60,000 cubic meters daily, but was operated beyond capacity at 70,000 cubic meters daily, and the new plant was planned with a capacity of 300,000 cubic meters daily to serve Haining City's 900,000 residents with a total capacity of 360,000 cubic meters daily. The contract was awarded through a competitive bidding process by the local Haining City government. The winning project company, Haining Salcon Water Company, was 60% owned by Salcon Zhejiang, the Chinese arm of Malaysian water company Salcon Berhad, and 40% by the water public utility, Haining City Water Supply Co. The project was estimated to cost MYR 150million (US$ 40.9million) and the new plant was to be completed in two phases of 150,000 cubic meters daily each. The existing plant was operational as of February 2007. Construction on the first phase of 150,000 cubic meters in the new plant was estimated to finish in 2007. |
Original sector | Water and sewerage |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant
