logo

Haley Pike Landfill Solar Project

Sector: Government • Location: Lexington, Kentucky, United States

Source: The Lexington Times

Project
Planned

A proposed solar energy project at the Haley Pike Landfill site in Lexington, Kentucky. The project involves leasing land to Edelen Renewables/Social Impact Solar to build a 67.4 megawatt solar facility across approximately 357 acres, including parts of the capped landfill. The facility is expected to power about 5,300 homes and reduce greenhouse gas emissions significantly. Construction could beg

Status
Prospective
Sector
Government, Solar, Power Generation (CCGT)
Location
Lexington, Kentucky, United States of America
Updated
22 Jul 2026
Source
The Lexington Times

ConstructChat

Ask ConstructChat about Haley Pike Landfill Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Haley Pike Landfill Solar Project” is an infrastructure initiative in the Government sector, located in Lexington, Kentucky, United States. Taiyo aggregates data on it from The Lexington Times.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed solar energy project at the Haley Pike Landfill site in Lexington, Kentucky. The project involves leasing land to Edelen Renewables/Social Impact Solar to build a 67.4 megawatt solar facility across approximately 357 acres, including parts of the capped landfill. The facility is expected to power about 5,300 homes and reduce greenhouse gas emissions significantly. Construction could begin in late spring 2026, with operations starting in December 2027 and continuing until January 2049.

Original sector

Energy

Location

Country

United States of America (USA)

State

Kentucky

City

Lexington

Source

Source

The Lexington Times

URL

More Details

Record type

Project

Sector

Government, Solar, Power Generation (CCGT)

Article published date

2025-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project