Halifax Community College Water Loop Replacement
Sector: Natural Gas • Location: Weldon, North Carolina, United States of America
Source: Dodge USA
The Project includes a Campus Wide Water Loop to provide additional water supply and water pressure to campus. Work includes the installation of new 12 water supply lines to tie back into the existing campus water supply lines, a new packaged booster pump station with 3 pumps and packaged controls, a new water meter valve vault, and a natural gas generator
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project includes a Campus Wide Water Loop to provide additional water supply and water pressure to campus. Work includes the installation of new 12 water supply lines to tie back into the existing campus water supply lines, a new packaged booster pump station with 3 pumps and packaged controls, a new water meter valve vault, and a natural gas generator |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
