Halifax Harbor Marina Pier Hurricane Repairs
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Removal of the damaged section, including piles, railings, bents, joist, deck boards, and timber post. The 50 Ft section will need to be reconstructed and tied back into the remaining fishing pier.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Forest Products and Packaging, Rail, Commercial, Seaport
- Location
- Daytona Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Halifax Harbor Marina Pier Hurricane Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of the damaged section, including piles, railings, bents, joist, deck boards, and timber post. The 50 Ft section will need to be reconstructed and tied back into the remaining fishing pier. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Daytona Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Forest Products and Packaging, Rail, Commercial, Seaport |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
