Hallandale Beach WTP Disinfection Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project is to increase the water treatment disinfection process to 4-log. This allows the process to have the highest rating of disinfection capability., making permitting with SFWMD for future treatment operations needed for when saltwater intrusion eventually impacts our raw water supply.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Hallandale Beach, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hallandale Beach WTP Disinfection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project is to increase the water treatment disinfection process to 4-log. This allows the process to have the highest rating of disinfection capability., making permitting with SFWMD for future treatment operations needed for when saltwater intrusion eventually impacts our raw water supply. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Hallandale Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
