logo
ProjectClosed

Halliday Road Culvert Replacement

One of 7,161 projects Taiyo tracks in Vermont.

Source: Dodge USA

Job Contract Locations: Addison Keywords: Construction Non Building, Culvert Replacement Bid Description: Town of Middlebury Owner is requesting Bids for the construction of the following Project: Halladay Road Culvert Replacement The Project includes the following Work: The replacement of an existing 5-foot corrugated metal culvert with a precast concrete box culvert with the internal dimensions

Status
Closed
Sector
Cement, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial, Road, Government
Location
Middlebury, Vermont, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Halliday Road Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Halliday Road Culvert Replacement” is an infrastructure initiative in the Cement sector, located in Middlebury, Vermont, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Job Contract Locations: Addison Keywords: Construction Non Building, Culvert Replacement Bid Description: Town of Middlebury Owner is requesting Bids for the construction of the following Project: Halladay Road Culvert Replacement The Project includes the following Work: The replacement of an existing 5-foot corrugated metal culvert with a precast concrete box culvert with the internal dimensions of 6-foot wide by 5-foot tall and 39-foot long. The installation of this culvert will also requir...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Vermont

City

Middlebury

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial, Road, Government

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project