Halsted Landing Mixed Use Residential Tower - Garage Phase 1
Sector: Manufacturing (Industrial) • Location: Chicago, Illinois, United States of America
Source: Dodge USA
Four story podium topped by 11 story midrise portion and a 56 story point tower - Reaching 600 feet tall, the square tower volume will be clad in a window wall system with outdoor balconies running up the facade - Green space off of Halsted earmarked for future 9 story addition -- The first phase will rise on the northwest corner of the site along the river. Rising over 600 feet in height, it will
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial, Car parking, Automotive
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Halsted Landing Mixed Use Residential Tower - Garage Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Four story podium topped by 11 story midrise portion and a 56 story point tower - Reaching 600 feet tall, the square tower volume will be clad in a window wall system with outdoor balconies running up the facade - Green space off of Halsted earmarked for future 9 story addition -- The first phase will rise on the northwest corner of the site along the river. Rising over 600 feet in height, it will feature 688 residential units of which 148 will be liner units along the large podium containing... |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial, Car parking, Automotive |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
