logo

Hamad International Airport, Doha, Qatar

Sector: Aerospace & Defense • Location: Qatar

Source: Bechtel

Project
Close

Hamad International Airport,Gateway to the world Bechtel provided engineering, project management, and construction management services for the new Hamad International Airport in Qatar.

Opened in 2014, Hamad (formerly New Doha International Airport) replaces Doha International Airport. It provides significantly increased passenger capacity and cargo facilities. Hamad also offers airfield capacit

Project Information FAQ

Project Information

4 Q
The project “Hamad International Airport, Doha, Qatar” is an infrastructure initiative in the Aerospace & Defense sector, located in Qatar. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hamad International Airport,Gateway to the world Bechtel provided engineering, project management, and construction management services for the new Hamad International Airport in Qatar. Opened in 2014, Hamad (formerly New Doha International Airport) replaces Doha International Airport. It provides significantly increased passenger capacity and cargo facilities. Hamad also offers airfield capacity for a wide range of aircraft including the latest A380 within the ever-expanding fleet of Qatar Airways. Image gallery Immense and sophisticated The new airport initially accommodates 24 million passengers and 750,000 metric tons of cargo annually. It features, among other facilities: two of the longest commercial runways in the world a control tower some 85 meters (about 280 feet) tall a striking passenger terminal of nearly 5.5 million square feet (some 510,000 square meters) with 40 gates a separate terminal for the Emir of Qatar a general aviation terminal a cargo terminal a 150,000-square-meter (1.6 million-square-foot) aircraft maintenance center one of the world’s largest airport catering facilities state-of-the art air-traffic-control equipment and security systems Rising from reclamation, environmental clean-upEarly works on the project included a 62-million-cubic-meter (nearly 230-million-cubic-foot) land reclamation project to create the airport site and the largest environmental clean-up project in Qatar’s history―the removal of 6.5 million cubic meters of household waste from a dump on the project site to a remote engineered landfill built to strict environmental standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data