Hamburg-Wilhelmsburg Geothermal Heating Project Heat Pumps
Sector: Geothermal • Location: Hamburg, Germany
Source: ThinkGeoEnergy
Two four-stage heat pumps are being manufactured for the geothermal district heating project in Hamburg-Wilhelmsburg, Germany. The heat pumps will have a combined output of 8 MW and a COP of up to 4.5, designed to increase the temperature of geothermal water to the 75-85 °C needed by the district heating network, enabling supply to over 6,000 households.
- Status
- Under Construction
- Sector
- Geothermal, Manufacturing (Industrial), Water Supply and Storage
- Location
- Hamburg, Germany
- Updated
- 22 Jul 2026
- Source
- ThinkGeoEnergy
ConstructChat
Ask ConstructChat about Hamburg-Wilhelmsburg Geothermal Heating Project Heat Pumps
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Two four-stage heat pumps are being manufactured for the geothermal district heating project in Hamburg-Wilhelmsburg, Germany. The heat pumps will have a combined output of 8 MW and a COP of up to 4.5, designed to increase the temperature of geothermal water to the 75-85 °C needed by the district heating network, enabling supply to over 6,000 households. |
Original sector | Energy |
Location
Country | Germany |
State | Hamburg |
City | Hamburg |
Source
Source | ThinkGeoEnergy |
URL |
More Details
Record type | Project |
Sector | Geothermal, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2025-06-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
