Hamilton Bridge Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project will replace the Hamilton Bridge over Metrolink, located between Nina Place and DiGiverville Avenue. Improvements include the complete removal and replacement of the bridge, new ADA compliant sidewalks and ramps, new street lighting, and utility work.
- Status
- Closed
- Sector
- Power Transmission, Bridge, Car parking, Road, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Saint Louis, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hamilton Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace the Hamilton Bridge over Metrolink, located between Nina Place and DiGiverville Avenue. Improvements include the complete removal and replacement of the bridge, new ADA compliant sidewalks and ramps, new street lighting, and utility work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Saint Louis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Bridge, Car parking, Road, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
