Hamilton Drain Storm Water Improvements Phase 4
Sector: Water Supply and Storage • Location: Des Moines, Iowa, United States of America
Source: Dodge
The improvement includes the construction of 15-inch to 48-inch diameter trenched and trenchless storm sewer, manholes, intakes, subdrain, sanitary sewer, Portland Cement Concrete (PCC) pavement, Hot Mix Asphalt (HMA) paving, removals, PCC sidewalk, PCC driveways, earthwork, water main adjustments, traffic control, fencing, site furnishings, erosion control, and surface restoration, all in accorda
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hamilton Drain Storm Water Improvements Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvement includes the construction of 15-inch to 48-inch diameter trenched and trenchless storm sewer, manholes, intakes, subdrain, sanitary sewer, Portland Cement Concrete (PCC) pavement, Hot Mix Asphalt (HMA) paving, removals, PCC sidewalk, PCC driveways, earthwork, water main adjustments, traffic control, fencing, site furnishings, erosion control, and surface restoration, all in accordance with the contract documents including Plan File No. 672-001/108 for the construction of storm... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
