logo
ProjectBid Results

Hamilton HS Stem Lab Remodel

Bid results · Tennessee · Last reported Aug 2024

Source: Dodge USA

Scope of work includes, but not limited to, Upgrade existing classroom(s) 229, 212, 227, 132A, and 211 to Stem Lab(s) classrooms to include: Electrical work, painting, floor replacement, lighting upgrade, equipment removal, cabinet demolition, and sink replacement

Status
Closed
Sector
Power Generation (CCGT), Government, Commercial, Education
Location
Memphis, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hamilton HS Stem Lab Remodel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hamilton HS Stem Lab Remodel” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Memphis, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope of work includes, but not limited to, Upgrade existing classroom(s) 229, 212, 227, 132A, and 211 to Stem Lab(s) classrooms to include: Electrical work, painting, floor replacement, lighting upgrade, equipment removal, cabinet demolition, and sink replacement

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Memphis

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial, Education

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project