logo

Hamilton Library Phase II

Sector: Cement • Location: United States of America (USA)

Source: Kiewit Construction

Project
Completed

The Hamilton Library project involved the removal and replacement of the HVAC equipment and controls on all five floors of the Hamilton Library Phase II, totaling 131,000 SF. Strict project phasing was required, as the library remained in operation during renovation. The Hamilton Library houses a large collection of books that could not be subject to adverse conditions of high or unstable temperat

Project Information FAQ

Project Information

5 Q
The project “Hamilton Library Phase II” is an infrastructure initiative in the Cement sector, located in United States of America (USA). Taiyo aggregates data on it from Kiewit Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Hamilton Library project involved the removal and replacement of the HVAC equipment and controls on all five floors of the Hamilton Library Phase II, totaling 131,000 SF. Strict project phasing was required, as the library remained in operation during renovation. The Hamilton Library houses a large collection of books that could not be subject to adverse conditions of high or unstable temperature or relative humidity, dust, theft, or damage. Kiewit coordinated all book relocation and sealing of books that couldn’t be moved with the University and Library. The scope of the work consisted of removal and replacement of 10 air handling units, ductwork, chilled water piping, and related accessories. Scope also included the removal/replacement of two supply fans and one exhaust fan. Kiewit provided new electronic controls connected to the existing EMCS. Work included book relocation and protection, selective demolition, concrete, structural steel, metal fabrications, elastomeric non-slip coating, fluid applied roof system, flashing and sheet metal, sealants and caulking, metal support systems, acoustical spray insulation, gypsum board, acoustical suspended ceilings, painting, removal and disposal of paint, removal and disposal of polychlorinated biphenyls (PCB’s) and mercury, hiring of a third party air monitoring contractor, general mechanical requirements, insulation of mechanical systems, chilled water and condensate piping, air conditioning and ventilation, ductwork and ductwork accessories, direct digital control system, testing and balancing air and water systems, electrical work, lighting refurbishment, and other miscellaneous related work. Preservation of all books was a priority on this project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data