logo
ProjectStart

Hamilton Road Extension Ph 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Hamilton Road will generally be constructed from Bunn Street to Commerce Parkway to Morrissey Drive. Route will include an at-grade railroad crossing. Road section will be four lane with a two-way left turn lane and include curb and gutter and storm sewer. Additional work will be performed on Rhodes Lane which will end in a cul-de-sac and be closed at Morrissey Drive.

Status
Prospective
Sector
Water Supply and Storage, Mass Transit, Road, Waste Processing and Treatment, Government, Rail, Commercial, Car parking, Automotive, Manufacturing (Industrial)
Location
Bloomington, Illinois, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hamilton Road Extension Ph 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hamilton Road Extension Ph 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Bloomington, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Hamilton Road will generally be constructed from Bunn Street to Commerce Parkway to Morrissey Drive. Route will include an at-grade railroad crossing. Road section will be four lane with a two-way left turn lane and include curb and gutter and storm sewer. Additional work will be performed on Rhodes Lane which will end in a cul-de-sac and be closed at Morrissey Drive.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Bloomington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Mass Transit, Road, Waste Processing and Treatment, Government, Rail, Commercial, Car parking, Automotive, Manufacturing (Industrial)

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project