Hamina LNG Terminal

Sector: LNG • Location: Finland

Source: Hydrocarbon Technology

Project
Closed

The Hamina LNG import terminal will be connected to the local gas network of Hamina and the Finnish national gas grid. Credit: Wartsila. The Hamina LNG receiving terminal is being constructed on the port of Hamina. Credit: Port of HaminaKotka Ltd. The LNG terminal will have a 30,000m³ natural gas storage tank during its initial phase of operation. Credit: Dave Crosby. The Hamina LNG Terminal is a

Project Information FAQ

Project Information

5 Q
The project “Hamina LNG Terminal” is an infrastructure initiative in the LNG sector, located in Finland. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Hamina LNG import terminal will be connected to the local gas network of Hamina and the Finnish national gas grid. Credit: Wartsila. The Hamina LNG receiving terminal is being constructed on the port of Hamina. Credit: Port of HaminaKotka Ltd. The LNG terminal will have a 30,000m³ natural gas storage tank during its initial phase of operation. Credit: Dave Crosby. The Hamina LNG Terminal is a liquefied natural gas (LNG) receiving terminal that is currently being built at the Port of Hamina, Finland. It is being developed by a joint venture (JV) comprising Finnish energy company Hamina Energia Oy and Estonian firm Alexela Varahalduse known as Hamina LNG Oy. The Hamina import terminal project forms part of Finland’s wider plan to establish a network of medium-scale LNG terminals in order to provide LNG for ship bunkering and increase gas supply within the country. The necessary approvals for the two-phase construction of the terminal were received in May 2018. Earthwork preparations for the project initially began in 2017 and were concluded in the first half of 2018. The construction of the terminal is currently underway and full operations are anticipated to commence in August 2020. LNG from the terminal is expected be fed to Hamina Energia’s local gas network and the Finnish national grid. The Hamina LNG terminal is slated to open a new gas import market in Finland. A 30,000m³ LNG storage tank will be built during the first phase of development along with other infrastructure such as a regasification plant, gas metering facility, boil-off gas handling (BOG) system and loading / unloading facilities, as well as electrical and control systems. Bunkering and truck loading facilities will also be built in order to enable truck-to-ship LNG bunkering at the site. The second phase will include construction of an additional storage tank with a capacity of 20,000m³, in addition to receiving and transhipment facilities. The total cost of the Hamina reception terminal is estimated to be approximately €100m ($117.7m). Finland’s Ministry of Economic Affairs and Employment provided a sum of €27.7m ($33.7m) for the project as an investment subsidy in December 2014. The grant was approved by the European Commission in March 2016. Swedish bank Skandinaviska Enskilda Banken and Finnish state-owned specialised financing company Finnvera agreed to provide debt financing for the construction of the terminal in May 2018. Wärtsilä received a turnkey engineering, procurement and construction (EPC) contract for the Hamina terminal in October 2017. The scope of the deal includes site filling, soil refurbishment, civil works and the construction of full containment storage tank and infrastructure facilities. Wärtsilä owns a minority stake in Hamina LNG Oyvia its financing arm, Wärtsilä Development and Financial Services (WDFS). The Hamina LNG receiving terminal is expected to help diversify and expand gas supply sources in Finland and increase the competitiveness of the Port of Hamina. The project is slated to reduce carbon emissions by providing cleaner fuel for transportation within the country. It will also contribute to the economic growth of the region by creating 100 jobs during the construction phase and ten jobs during the operational phase. Furthermore, the terminal will support the development of alternative fuels infrastructure at Hamina as part of the trans-European transport network (TEN-T) programme. The project will also support the energy-dependent industries situated at the port. Hamina port is a leading facility that is currently being used for Finland’s wood-processing industry. The port caters to various types of cargo such as liquid bulk, dry bulk, gas, containers, roll-on / roll-off (RoRo), lift-on / lift-off (LoLo) and project shipments. In addition, Hamina port spans 500ha of land and is equipped with one rail weighbridge, five truck weighbridges and two container cranes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data