Hammonasset Beach State Park - Lining Repair Rehabilitation
Sector: Water Supply and Storage • Location: Madison, Connecticut, United States of America
Source: Dodge USA
Scope of work : This project involves the repair of an existing 60 Corrugated Metal Pipe (CMP) using Ultra Violet Cured In - Place - Pipe (UV CIPP) Lining repair/rehabilitation technology. Work also includes all the necessary CCTV inspection and cleaning/preparation of the culvert prior to the UV CIPP lining plus the post lining CCTV inspection of the culvert. The existing 60 CMP culvert that trav
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Car parking, Waste Processing and Treatment, Automotive, Commercial
- Location
- Madison, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hammonasset Beach State Park - Lining Repair Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work : This project involves the repair of an existing 60 Corrugated Metal Pipe (CMP) using Ultra Violet Cured In - Place - Pipe (UV CIPP) Lining repair/rehabilitation technology. Work also includes all the necessary CCTV inspection and cleaning/preparation of the culvert prior to the UV CIPP lining plus the post lining CCTV inspection of the culvert. The existing 60 CMP culvert that traverses the main park entrance and exit roadways appears to be in overall poor to serious structura... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Madison |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Car parking, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
