logo
ProjectPre-Design

Hampton Plaza Water Main Replacement

Sector: Metal • Location: Rochester Hills, Michigan, United States of America

Source: Dodge USA

Replacement of approximately 30-feet of 6-inch, 1,735-feet of 8-inch, and 795-feet of 16-inch cast iron water main located in Hampton Plaza. The water main is approximately 50-years old. The Cast Iron water main will be replaced with ductile iron or high-density polyethylene (HDPE) pipe, depending on the installation method. Construction is planned to begin in 2026.

Status
Prospective
Sector
Metal, Water Supply and Storage, Chemical (Industrial), Government, Steel, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
Location
Rochester Hills, Michigan, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hampton Plaza Water Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hampton Plaza Water Main Replacement” is an infrastructure initiative in the Metal sector, located in Rochester Hills, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replacement of approximately 30-feet of 6-inch, 1,735-feet of 8-inch, and 795-feet of 16-inch cast iron water main located in Hampton Plaza. The water main is approximately 50-years old. The Cast Iron water main will be replaced with ductile iron or high-density polyethylene (HDPE) pipe, depending on the installation method. Construction is planned to begin in 2026.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Rochester Hills

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Chemical (Industrial), Government, Steel, Commercial, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project