logo

Hanahan Athletic Stadium Seating

Sector: Stadium • Location: Hanahan, South Carolina, United States of America

Source: Dodge USA

Project
Closed

Furnish all materials and equipment for new stadium bleacher seating and press box at The Hawks Nest. The field is synthetic turf used for football and soccer. Bleacher seating will only be on one side of field. Scope of Services: Bleacher seating total capacity needs to be between 550-600. Bleachers must be equipped with ramp and railing system. Bleacher seating must be wheelchair accessible. Ble

Status
Closed
Sector
Stadium, Rail, Government, Commercial, Manufacturing (Industrial)
Location
Hanahan, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hanahan Athletic Stadium Seating

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hanahan Athletic Stadium Seating” is an infrastructure initiative in the Stadium sector, located in Hanahan, South Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Furnish all materials and equipment for new stadium bleacher seating and press box at The Hawks Nest. The field is synthetic turf used for football and soccer. Bleacher seating will only be on one side of field. Scope of Services: Bleacher seating total capacity needs to be between 550-600. Bleachers must be equipped with ramp and railing system. Bleacher seating must be wheelchair accessible. Bleacher seating must contain no less than 6 wheelchair accessible viewing/seating areas. Bleacher s...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Hanahan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Stadium, Rail, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-06-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project