logo
ProjectStart

Hangingstone River Bridge

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Grading, Construct Structural Steel Girder Bridge, Granular Base Course, Asphalt Concrete Pavement and Other Work 63:10 Re-alignment and Hangingstone River Bridge Replacement ? kilometre 15.280 to 17.820 (SBL) 63:10 B.F. 75907S Carrying Hwy. 63 over the Hangingstone River North Central and Fort McMurray Region APPROXIMATE QUANTITIES: 135 934 tonnes Supply of Aggregate ? No Option 306 600 cubic met

Status
Under Construction
Sector
Commercial, Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Metal
Location
Fort Mcmurray, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Hangingstone River Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hangingstone River Bridge” is an infrastructure initiative in the Commercial sector, located in Fort Mcmurray, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Grading, Construct Structural Steel Girder Bridge, Granular Base Course, Asphalt Concrete Pavement and Other Work 63:10 Re-alignment and Hangingstone River Bridge Replacement ? kilometre 15.280 to 17.820 (SBL) 63:10 B.F. 75907S Carrying Hwy. 63 over the Hangingstone River North Central and Fort McMurray Region APPROXIMATE QUANTITIES: 135 934 tonnes Supply of Aggregate ? No Option 306 600 cubic metres Common Excavation 147 300 cubic metres Common and/or Borrow Excavation Loaded to Trucks 483 8...

Procurement method

Location

Country

Canada

State

Alberta

City

Fort Mcmurray

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Metal

Article published date

2024-02-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project